Construction & DIY

Concrete Slab Calculator

Flat work in one pass: the yards to order, the bags if you must, what the pour weighs — and what each square foot of finished slab cost you.

Concrete Slab Calculator

Results recalculate instantly on every keystroke. Nothing you type is transmitted.

The slab
Order
Material
Order Volume
—
net × waste. The number on the order ticket.
Net Volume—
If Bagged—
Truck Cost—
Slab Weight—
Cost Per Square Foot—
Steel & Buy Decisions—
Flat Work Doctrine—

What this result does not account for

  • Rectangular slabs only — no thickenings or openings.
  • Grade assumed flat; subgrade corrections ride in the waste %.
  • No forming, finishing or labour in the cost cards.
● Zero-Server Execution Updated 11 Aug 2026 Reviewed by Marcus Thorne, P.E. IEEE-754 Double Precision

In short: A 20 × 24 ft slab at 4 in: 160 ft³ net, 176 ft³ with 10% waste = 6.518519 yd³ — 294 bags or $1,140.74 of truck. The pour weighs 12.00 tons and each finished square foot carries $2.38 of concrete.

Formula

net ft³ = L × W × thickness ÷ 12

order yd³ = net × (1 + waste) ÷ 27

bag count = ⌈order ft³ ÷ 0.60⌉

weight = net × density ÷ 2,000

[('thickness', 'the squared lever: inches are cheap, yards are not'), ('waste', "subgrade dips, spillage, the mixer's appetite"), ('weight', 'dead load the base and soil carry forever'), ('per ft²', 'the only comparable slab number')]

Worked Example

  1. Multiply length, width and thickness for the net volume.
  2. Apply the waste allowance and convert to yards.
  3. Show both buys: sacks at 0.60 ft³, truck at the yard rate.
  4. Weigh the pour against the base and soil beneath it.
  5. State the per-square-foot cost for honest quote comparison.

20 × 24 ft at 4 in: 160 ft³ net, 176 ft³ ordered = 6.518519 yd³. Bagged, 294 sacks; trucked, $1,140.74 at $175. The slab weighs 12.00 tons, and each of the 480 square feet carries $2.38 of concrete.

Strengths & Limits Of This Model

Where this engine is strong

  • Weight and per-ft² cards, not just yards
  • Defers the buy and the steel to the pages that own them
  • Free-entry thickness with code-common chips

Where it stops

  • Rectangles only
  • No integral footing thickened edge

Risk & accuracy notice. The order is a minimum with a straight face: a truck that runs out mid-pour leaves a cold joint no extra yard can remove. When the site is soft or the run is long, round the order up — surplus concrete is a bill, short concrete is a scar.

Practical Use Cases

Patio & shed pads

The classic 4-inch residential pour.

Driveway planning

5-6 inch slabs priced per square foot.

Garage floors

Yards, weight and the steel decision.

Quote comparison

One number that survives between bids.

Delivery sizing

Yards vs the short-load fee boundary.

Methodology & Editorial Standards

Net volume is the rectangular prism L × W × t/12; the order applies the waste allowance multiplicatively and divides by 27. Bag counts ceil at the exact 0.60 ft³ yield, truck cost is order yards times the entered rate, and the dead load multiplies net volume by the entered placed density. The per-square-foot card divides truck cost by finished area so quotes compare on the only slab number that scales.

Computation runs in IEEE-754 double precision at full internal precision; rounding to two decimal places occurs strictly at the display layer, so no cumulative drift enters the result. All monetary outputs use accounting presentation — grouped thousands, two decimals, negatives in parentheses — so figures can be transcribed directly into a model or working paper. Division-by-zero and out-of-domain inputs return an em-dash rather than a misleading number.

This engine was reconciled against an independent reference implementation and hand-verified for the worked example above before release. Our full five-stage review process is published on the About Us page.

Marcus Thorne, P.E. Engineering & Construction Lead · ApexConverter

Chartered structural engineer; validates material take-offs and load sizing. Last reviewed: 11 August 2026.

Disclaimer. This calculator is provided for informational and modelling purposes only and does not constitute financial, tax, legal, medical, or engineering advice. Verify all figures with a qualified professional before acting on them.


Concrete Slab Calculator — 10 Expert FAQs

10 analyst-written answers to the questions practitioners actually ask — optimised for voice and answer-engine retrieval.

How do I calculate yards of concrete for a slab?

Length × width × thickness in feet, divided by 27. For the 20 × 24 ft slab at 4 inches: 160 ft³ = 5.925926 yd³ net, 6.518519 with a 10% allowance — the order number.

How thick should a concrete slab be?

4 inches covers patios, walks and shed pads; residential driveways and garage floors run 5-6 with a compacted base under. Thickness is the cheapest strength you can buy at design time and the most expensive to add afterwards.

How much waste should I add?

Ten percent is the working default for formed flat work: subgrade irregularities and spillage eat it. The waste page's doctrine explains why two small allowances compound — and why the order is always rounded up, never down.

How much does a 20x24 concrete slab weigh?

12.00 tons at normal-weight 150 lb/ft³: 160 ft³ × 150 ÷ 2,000. The placed weight is why the base under it is engineered, not decorative.

How much does a concrete slab cost per square foot?

At $175/yd³ and 4 inches, $2.38 per finished square foot for material. Labour, forming and finishing typically double or triple the all-in number; material is the floor you can quote from.

Does a 4 inch slab need rebar?

It needs reinforcement of some kind — rebar grid or welded wire — because concrete's tensile strength is a tenth of its compressive. The grid decision is the rebar page's: 18-inch centres on #4 is the residential default.

How many bags for a 10x10 slab?

At 4 inches: 33.3 ft³ net, 36.67 with 10% — 62 sacks of 80 lb. That is the concrete page's crossover zone: price the short-load truck before committing to 62 mixes.

What is a cubic yard of concrete?

27 cubic feet — concrete that covers 81 ft² at 4 inches, or 45 of the 80-lb sacks. Every order ticket, supplier quote and truck on the road is priced in these yards.

Should I order extra concrete for the slump test?

The 10% allowance already carries test concrete and the pump's priming charge if your supplier expects it — confirm both when you book. Ordering twice because the first truck came up short costs a second fee, not just a second yard.

Slab-on-grade or a footing first?

Independent slabs on prepared base are the DIY norm; structures, frost lines and local codes want a footing under the perimeter first — that page is next in the family. This page pours what sits on grade.